OK, I really want our AC (which is 20 years old) replaced by a heat pump before it fails, but the dependency chain for that is:
- Get a Mass Save assessment, in which they'll probably require us to get rid of the vermiculite insulation in the attic (which we want to do anyway).
- Get a guy to get rid of vermiculite.
- Get heat pump.
I did get the assessment scheduled, but it's not for two weeks.