- Dropped off, picked up.
- Paid bills.
- Job.
- Had a call with the guy's counselor.
- Bought some Christmas presents.
- Made dinner.
- "Designed" a floor for the closet. Mostly, confirmed we had enough scrap maple to cover it.
- Added data point text displaying and a new graph for event lengths to Flooding. Started adding panning.
- Did some arranging on a few small dungeon synth pieces.